Balram Talab Yojana
At a Glance
Scheme Category
Agriculture,Rural & Environment,Land and water resources,Financial assistance
Target Beneficiaries
Individual
Brief Description
The scheme aims to conserve rainwater in fields to help farmers, ensuring water availability during irrigation and drought conditions. Farmers receive subsidies up to ₹1,00,000/- for pond construction.
Benefit Type
Cash
Eligibility Criteria
- The applicant must be a permanent resident of Madhya Pradesh. - The applicant must possess agricultural land. - The applicant must have installed drip or sprinkler sets in financial year 2017-18 or thereafter, and these must be currently in operational condition, to be eligible for subsidized pond construction. - The applicant must construct the pond on their own land. Subsidy will not be provided for pond construction on leased land.
Application Mode
Online
Application Process
Step 1: Visit the <nis:link nis:type=webUrl nis:id=slugId nis:text="MP DBT Agriculture Portal" nis:value=https://farmer.mpdage.org/ nis:enabled=true/>. Navigate to the "पंजीकरण" (Registration) section. Complete Aadhaar authentication using OTP. Step 2: On the next screen, provide your personal details: Name, Address, Mobile Number, and Land Ownership Information. Upload the following mandatory documents: Aadhaar Card, Land Records (e.g., Khasra/Khatauni), Bank Passbook, Passport-size Photo. Step 3: On the next screen, a list of available schemes will be displayed. Select "Balram Talab Yojana" scheme from the list. You will be taken to the online form of the scheme. Step 4: In the form, fill in all the mandatory fields and upload all the mandatory documents in the specified format and size. Step 5: Carefully review all the information provided and the documents uploaded. Make any necessary corrections. Submit the application and note the application ID for future tracking.
Required Documents
- - Aadhaar Card
- - Identity Card
- - Permanent Residence Certificate
- - Bank Account Passbook
- - Passport Size Photograph
- - Khasra Document
- - Caste Certificate
- - Demand Draft Document
- - Registered Mobile Number
FAQs
What is the maximum financial assistance available for constructing a pond on agricultural land under this government initiative for water conservation?
The maximum subsidy provided is ₹1,00,000/- for Scheduled Caste or Scheduled Tribe farmers, representing 75% of construction costs, while general category and small-marginal farmers receive up to ₹80,000/-.
If I belong to the Scheduled Caste category and want to build a rainwater harvesting structure, what%age of the total construction cost will the state government bear?
Farmers from Scheduled Caste or Scheduled Tribe categories receive 75% of the construction cost as subsidy, with a maximum limit of ₹1,00,000/-, for building rainwater conservation structures.
Is it mandatory for farmers to have any specific irrigation equipment already installed on their farmland before they can apply for assistance?
Yes, only those farmers who have installed drip or sprinkler irrigation sets in financial year 2017-18 or thereafter, and these systems are currently operational, are eligible for subsidized pond construction approval.
Can a farmer who has previously received benefits under this water conservation program apply again for constructing another pond on different agricultural land?
No, the benefit of this scheme is provided to each farmer only once, meaning a farmer cannot apply multiple times even if they own different parcels of agricultural land.
What is the minimum requirement regarding land ownership for farmers interested in participating in this rainwater harvesting scheme?
Farmers must construct the pond on their own agricultural land as subsidy will not be provided for pond construction on leased or rented land, making land ownership a mandatory requirement.
How much time does it typically take for the subsidy amount to be transferred to the beneficiary's bank account after the pond construction is completed?
The subsidy is provided within 30 days based on the evaluation and assessment conducted by the Soil Conservation Staff after completion of the construction work.
Are farmers from all social and economic categories eligible to participate in this agricultural water management program being implemented statewide?
Yes, all categories of farmers including general category, small and marginal farmers, and Scheduled Caste or Scheduled Tribe farmers are eligible to avail benefits under this scheme.
What happens if a farmer who has received subsidy does not install the mandatory safety signboard at the pond location as required?
In the absence of a mandatory safety board at the pond site, if any drowning or accident occurs, the farmer will be solely and completely responsible for all consequences.
Is there any difference in the subsidy%age provided to small and marginal category farmers compared to general category farmers under this initiative?
Yes, small and marginal farmers receive 50% of construction costs or maximum ₹80,000/-, which is higher than the 40% or maximum ₹80,000/- provided to general category farmers.